- Installing HVAC units, line sets, and sprinkler lines in the attic.
- Electrical / Telecom / Fire Alarm rough‐in throughout building is ongoing.
- Setting door frames and hanging sheetrock on the bottom of the trusses next week.
- Laying brick and grout on all elevations
- Sanitary / Vent installation throughout the building happening next week.
- Insulating all pipes and framing hard ceilings.