Construction Update – 8/21/17 from Ryan Nebel, Construction Superintendent
  • Electrical/Telecom/Fire Alarm rough-in of walls through building complete.
  • Waterline/Waste/Sanitary/Vent plumbing rough-in complete.
  • Install ductwork in attic and insulate duct.
  • Repair all Tyvek and air barrier on exterior skin of building.
  • Hang sheetrock on bottom of trusses.
  • Lay brick and grout on all elevations.
  • Insulating all pipes in building.